Saturday, November 22, 2008
Ready for Fill Dirt
In preparing for the plumbing in this garage (turning into a three bedroom, two bath house)I was building a retaining wall to terrace the side near the creek. Now the wall is ready for digging to begin. There will have to be a hole for the grinder pump and a ditch for the drain lines. The extra dirt will be deposited behind this retaining wall.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment